Bluco ACS Inspection

Records held on this device

Sites

Outstanding actions

On site

Auto-advance suits routine visual inspections, where most answers are compliant. It pauses on any answer needing a note, a category or a measurement.

Equipment

Instruments used to take a measurement are recorded here with their calibration position, and named in the report. A measured value from an unidentified or out-of-calibration instrument carries little weight.

Inspector details

Recorded once and used to pre-fill the sign-off on every inspection. You can amend any of it at the point of signing; the wording used on the day is what appears in the report.
Enter one statement per line. Each becomes an option in the drop-down at sign-off, so a different basis can be selected for different work. A consistent statement across reports carries more weight than one worded differently each time. Rope access certification is recorded separately below.

RAMS and policies

Risk assessments, method statements and the health and safety policy live here so they travel with the rest of the records on this device, rather than as separate paperwork. Each can be read and individually acknowledged by anyone working under it.

Backup and transfer

Export everything to move to a new device or to keep a copy off this one. Export a single site when handing work to someone else — a whole-device backup would give them every client you hold. Importing merges records; anything already present is left as it is.

Sync between devices

Sends the sites on this device to a shared store and brings back whatever is newest for each site, so this device and any other with the same sync key converge. Photos sync too, but only as low-resolution thumbnails to keep this quick over a phone connection — use Backup and transfer above to move full-resolution originals between devices.

Build

This device is running build .

New site

Structures

One Word document covering every structure's most recent signed inspection and the site's most recent signed PPE inspection, each as its own clearly headed section. Structures with no signed inspection yet are left out and listed at the end.

Equipment and PPE

Duty holder's own RAMS / site documents

Bluco's own RAMS live under RAMS and policies on the home screen. This is the opposite direction — a place to keep whatever site-specific risk assessment, method statement, induction pack or fire evacuation procedure this duty holder has provided, so a technician visiting this site can find and confirm they've read it before starting work.

Open defects

Trial data

One row per question answered, across every inspection on this site. Open it in a spreadsheet to see which checks never produce findings, which are always marked not applicable, and how long each tier actually takes.

New structure

Where the manual is held online, record the address. It is the same address a QR code on the marking notice would point to, so recording it here keeps the plate and the record pointing at the same document. Clause 6 requires the manual to be provided; a link does not discharge that, and the duty holder still needs their own copy.
The standard defers to the manufacturer's stated interval, between one and three months. Where no manual is held, one month is the safe assumption.

Declaration of anchor use

Where no person with authority is available, record the position from observation and seek written confirmation afterwards. An inspector's observation is not a declaration by the duty holder and the report will distinguish between the two.

Protection point map

Signage

Findings carried forward

Anchor devices (BS EN 795)

Generates an anchor device installation record for this structure's register, to BS EN 795:2012 with regard to BS 7883:2019. Fields the register does not hold — fixings, torque, proof loading — are left for completion by the installer.

Auto-belay devices

Start an inspection

Inspection history

For the marking notice only. Clause 5 e) requires this date to be shown. Record what it says, even where it has passed.
Name the document this came from. The report states that the finding was reported by others and has not been independently verified unless it was seen at this inspection.

Add quickly

Brand and model are remembered, so a run of identical items needs only the serial each time.

Items

Item 1PPE
A tracked defect carries forward with its photographs, so the same wear can be compared from one inspection to the next. The judgement on textiles is usually about the rate of change rather than the condition on any one day.

Sign off

Six months is the common interval for equipment in frequent use. The manufacturer’s instructions and the duty holder’s risk assessment govern.
One record per item. Where a batch shares a single marking, add a suffix so each remains individually identifiable.
Where the duty holder cannot provide these dates, record them as unknown rather than guessing. Establishing them, and keeping records going forward, is the duty holder's responsibility, not something inspection can retrospectively supply.
From the manufacturer’s instructions. Most textile equipment is limited to 10 years from manufacture; metal items commonly have no stated limit, in which case leave blank.
Photograph the marking or label to record the serial and date of manufacture, and any defect. These stay with the item and appear in the report where relevant.
Keeping this consistent with the standards cited elsewhere in this app (the inspection checklists and reports) is what lets this document and the inspection records work from the same basis rather than drifting apart over time.
Attaching the actual PDF means it travels with this record in backups and opens on any device, even offline — the same way an anchor device's installation record does.

Acknowledgements

Anyone working under this document — employee or sub-contractor — can confirm here that they have read and understood it. This is a record of acknowledgement, not a substitute for actually briefing the team.

Confirmed read by

Anyone visiting this site to inspect or work can log here that they've read and understood the duty holder's own document above.
The intended use determines which regime applies to the device. Anchors for restraint, arrest, positioning and rope access sit under the Work at Height Regulations and BS 7883. Where a person is raised or lowered by mechanical means, further duties may arise. Record what the device was specified for; use beyond that is a matter for the duty holder.
Distinct from the intended use above. Intended use records what activity the device was specified for; this records who the declaration extends to. A device installed for Bluco’s own rope access work, for example, is not thereby available to any other person or organisation unless the duty holder separately extends that use.
Where Bluco installed the device and also examines it, the report records that fact. Installer-carried periodic inspection is accepted practice, but it is disclosed rather than left unstated.
Examination of an anchor device is carried out against BS 7883 and the manufacturer’s instructions, not against BS EN 12572. Include it only where you are competent and engaged to examine it, and where doing so is within your insurance.
The annual service interval runs from 15 months after manufacture, and every 12 months thereafter.
The six-month inspection requires the unit to be dismounted.
Taken from the webbing tag inside the device near the shackle. The manufacturer requires this date to be recorded in the inspection log, and recommends the webbing be replaced after 1.5 years of use regardless of its condition.
Step 1Routine visual
Every check at this tier. Tap any line to go back to it.

Remedial action

Recording work as complete does not close the finding. It is closed when a later inspection verifies it, which is what makes the record defensible.

Reissue

Reissuing produces the report again at a new revision. The record of what was inspected is unchanged; only the revision and the reason for it are added.

Findings

Sign off

Where a report is reissued, increment the revision and state briefly what changed. The amendment record appears in the report.
Selecting a statement fills the box below. Amend it if the circumstances of this inspection differ; the wording used here is what appears in the report.
State the basis on which you are competent to assess this structure against the standard. Rope access certification is an access qualification and is recorded separately below.

Declaration

Sign above
Elevation